Power & Control System Laboratory

Research

Research Projects

NO 과제기간 과제명
69 06. 2020 - 02. 2029
(in progress)
F/S : National Research Foundation (한국연구재단), Korea, Leading Researcher Program (리더연구)-단독 72억/9년
"Power System Research Center for Great Energy Transition (PREFER)"
68 06. 2023 - 02. 2030
(in progress)
F/S : National Research Foundation (한국연구재단), Engineering Research Center (ERC), Korea University - 참여
"Resilient Autonomous Grid Research Center"
67 12. 2024 - 12. 2025
(in progress)
F/S : (주) LG Electronics, Korea
"Development of RAC PFC of 2 kW"
66 11. 2024 - 10. 2025
(in progress)
F/S : (주) Hyosung Corp
[Hyosung-Yonsei Cooperative Research Center] "Evaluation Process Development to Analyze the Offshore Wind Power Plants"
65 12. 2023 - 12. 2024
(completed)

F/S : Yonsei Frontier Lab., Yonsei University

"[YDS] AI-Based Stability Evaluation of Power System on Energy Transition"

64 08. 2023 - 05. 2024
(completed)
F/S : (주) Hyosung Corp
“Evaluation Process Development to Analyze the Effect of ESS Power Plants on Large-Scale Power system”
63 03. 2023 - 02. 2024
(completed)
F/S : (주) Hyundai NGV (Hyundai Mobis), Korea
“Development of Overmodulation Method for Efficiency and Performance Optimization of Electric Vehicle Driving System”
62 08. 2023 - 10. 2023
(completed)
F/S : (주) KEPCO, Korea
“New Establishment of Transmission and Distribution Network Operation System”
61 05. 2022 - 04. 2023
(completed)
F/S : (주) Hyosung Corp
“Analysis of Effect of ESSs on Power Plant and Development of Its Detailed Model Based on Digslient Power Factory Software”
60 06. 2022 - 02. 2023
(completed)
F/S : [Technical Consulting] (주) KEPCO-KEPRI, Korea
“Energy Transition - CFI (Control, Flexibility, and Inertia) Expert Working Group”
59 05. 2022 - 04. 2023
(completed)
F/S : (주) LG Electronics Inc., Korea
“Development of Power Module Solution for 400 kW EV Fast Charger with High Efficiency and Small Size”
58 10. 2018 - 01. 2022
(completed)
F/S : (주) ESP, Korea
“Protection of Modular Green S/.S and Development of Monitoring Operation System for System Devices”
57 07. 2021
(completed)
F/S : (주) KEPCO, Korea
“[Consulting] Evaluation of Hosting Capacity of Renewables in Substation with 80 MVA Transformer”
56 06. 2018 - 06. 2021
(completed)

F/S : (주) KEPCO, Korea
[Cooperative Research Center] “PMU Date Based On-line Re-evaluation of Variable F/R Reserve and Development of Fast State Estimation Algorithm”

55

07. 2020 - 04. 2021
(completed)

F/S : (주) KEPCO, Korea
“A Study on the Compensation for Renewable Energy Curtailment”

54

06. 2020 - 03. 2021
(completed)

F/S : (주) Hyosung Corp.
“Development of ESS User-define Model with Smart Inverter Functions Based on Digslient Power Factory Software”

53

01. 2020 - 12. 2020

(completed)

F/S : (주) Hyundai Heavy Industries Co. LTD., Korea
“Development of Energy Management System of Electric Ship with Power Network Optimization and Load Forecasting Based on Navigation Data”
52 05. 2017 - 04. 2020
(completed)
F/S : KETEP (에너지기술평가원), Korea
“Development of Integrated PV/ESS System and Its EMS to Solve Capacity-Congestion of Distribution System of South Korea”
51 09. 2019 - 11. 2019
(completed)
F/S : [Technical Consulting] KERI
“Strategy to Improve Hosting Capacity of Variable Renewable Energy in Korea Power System on Energy Transition”
50 09. 2011 - 11. 2019
(completed)
F/S : National Research Foundation (한국연구재단), Korea - National Research Lab. (국가지정연구실) - 중견자 전력(도약)연구사업 - 1, 2단계(5년) + 후속(3년)
“A Study on Renewable Energy Based Integrated Optimal Operation and Analysis to Improve Reliability of Power System”
49 06. 2018 - 03. 2019
(completed)
F/S : (주) KEPCO, Korea
“Estimation of Renewable Energies Based DGs’ Capacity Permissible to a Practical Sub-station of South Korea”
48 02. 2018 - 10. 2018
(completed)
F/S : (주) KEPCO, Korea
“Grid-Code Development for DG Connection to 69 kV New Transmission System”
47 12. 2016 - 10. 2018
(completed)
F/S : (주) Hanwha Techwin Inc., Korea
“Development of Small-Size Inverter & Converter for Unmanned Search Vehicle”
46 06. 2017 - 06. 2018
(completed)
F/S : (주) DIK, Korea
[Industry Consulting] “Planning and Operation of Microgrid and its EMS”
45 05. 2017 - 03. 2018
(completed)
F/S : (주) Mando, Korea
“Improvement of Inverter Efficiency of 30% by New PWM Method Applied to IDB System”
44 04. 2016 - 01. 2018
(completed)
F/S : (주) KEPCO-KEPRI via KESRI, Korea
“Grid-Code Development of Distributed Generations in Stand-Alone Microgrid of Islanded Area”
43 01. 2014 - 12. 2017
(completed)
F/S : (주) POWERNIX, Korea
“Design of Voltage-Source-Converter(VSC) Based FACTS Devices”
42 12. 2014 - 09. 2017
(completed)
F/S :KETEP (에너지기술평가원), Korea
“PMU Based Multi-Microgrid Integrated Connection and Optimal Operation”
41 05. 2016 - 04. 2017
(completed)
F/S : (주) LG Electronics Inc., Korea
“Consulting of Energy Savings via Smart Factory”
40 10. 2016 - 03. 2017
(completed)
F/S : (주) KEPCO, Korea
“Re-Establishment of Grid-Code for Distributed Generations Connected to Transformer-Bank”
39 04. 2016 - 02. 2017
(completed)
F/S : (주) KEPCO-KEPRI via KESRI, Korea
“A Study on Benefit-Cost Analysis for Distributed Energy Resource Considering Environmental Cost”
38 09. 2014 - 08. 2016
(completed)
F/S : National Research Foundation (한국연구재단), Korea
“Engineering Research Center (ERC) - WeGAT, ChonBuk National University”
37 10. 2015 - 06. 2016
(completed)
F/S :(주) Mando, Korea
“Design of Automotive IDB Inverter with High Efficiency via Optimal PWM and Ripple Reduction”
36 08. 2013 - 07. 2016
(completed)
F/S : KETEP (에너지기술평가원), Korea
“Development of 6 kW Grid-Connected Hybrid PV PCS with EMS"
35 11. 2014 - 10. 2015
(completed)
F/S : Electric Power Public Tasks Evaluation & Planning Center (전력산업기반조성센터), Korea
“National Power Security and Wide-Area Blackout Prevention (Reliability Project)”
34 07. 2014 - 06. 2015
(completed)
F/S : (주) LG Electronics Inc., Korea
“Development of 2kW PFC Converter Applied to Input Voltage in Wide Ranges”
33 06. 2014 - 02. 2015
(completed)
F/S : KOITA - (주) KD Power Inc, Korea
“Development of PV String-Group MPPT and Circulation-Inverting Based PCS”
32 03. 2014 - 12. 2014
(completed)
F/S : (주) Hyundai Heavy Industries Co. LTD., Korea
“Design of Wind Power Plant and Its Evaluation Software Development”
31 07. 2014 - 12. 2014
(completed)
F/S : (주) KEPCO via KESRI, Korea
“A Study on Optimal Operating Reserve Required Capacity of Korea Power System”
30 09. 2010 - 06. 2015
(completed)
F/S : KETEP (에너지기술평가원), Korea
“Next-Generation High-Performance Super-Grid Research Center”
29 12. 2013 - 11. 2014
(completed)
F/S : (주) Jeju Kim-Nyeong Wind Power Company, Korea
“Analysis of Effect and Power Quality of Distribution System with Wind Power Plant”
28 12. 2013 - 11. 2014
(completed)
F/S : (주) KEPCO via KESRI, Korea (with HongIk University)
“Planning of Transmission System of HVDC Applied to Korea Power System”
27 12. 2013 - 09. 2014
(completed)
F/S : KETEP (에너지기술평가원), Korea
“Development of Induction Heating System for Reactor Coolant Pump in Nuclear Power Generation”
26 01. 2014 - 06. 2014
(completed)
F/S : (주) SHINC, Korea
“Design of Grid-Connected Distributed Generation PCS Inverter”
25 03. 2012 - 02. 2014
(completed)
F/S : (주) Mando, Korea
“Development of Power Control Logic for Electric Vehicle MSG and Energy Storage Optimization”
24 10. 2013 - 12. 2013
(completed)
F/S : (주) KEPCO via KESRI, Korea
“Analysis of Transmission System and its Response Strategy and due to Expansion of Distributed Generations”
23 05. 2013 - 12. 2013
(completed)
F/S : (주) KEPCO via KESRI , Korea
“Improvement of Grid-Connection Profile due to Expansion of Distributed Generations”
22 03. 2012 - 11. 2013
(completed)
F/S : (주) KEPCO, Korea
“Development of Measurement-Based Dynamic Load Modeling”
21 09. 2010 - 08. 2013
(completed)
F/S : National Research Foundation (한국연구재단), Korea
“Study on Optimization for Bi-Directional Protection Coordination Based on Digital Protective Relay Applied to Multi-DGs”
20 03. 2008 - 02. 2013
(completed)
F/S : BK21, Ministry of Education, Science and Technology (교육과학기술부), Korea
“BK21 TMS Institute of Technology” in School of Electrical & Electronic Engineering, Yonsei Univ.
19 12. 2010 - 11. 2012
(completed)
F/S : (주) E-Korea, Korea
“Smart Grid Based Electric Machine Condition Monitoring System Development”
18 08. 2010 - 07. 2012
(completed)
F/S : LS Industrial Systems (LS 산전), Korea
“Development of 3 kW Grid-Connected PV Inverter & Battery Management System”
17 05. 2009 - 04. 2012
(completed)
F/S : Korea Research Foundation (학술진흥재단), Korea
“New Power Quality Index in a Distribution Power System Based on Real-Time Optimization Model”
16 04. 2011 - 01. 2012
(completed)
F/S : Korea Power Exchange (전력거래소), Korea
“Effect of Demand Response (DR) on Long-Term Load Forecasting”
15 08. 2010 - 01. 2012
(completed)
F/S : Korea Power Exchange (전력거래소), Korea
“Load Modeling Applied to Korea Power System”
14 11. 2010 - 04. 2011
(completed)
F/S : POSCO (포스코), Korea
“A Study on Distributed Generation Based Economic Dispatch, Power Quality, and Demand Response for Application to Energy Management System”
13 07. 2007 - 06. 2011
(completed)
F/S : Ministry of Commerce, Industry and Energy (산업자원부), Korea
“New Electric Machines Applied to Power Grid” Yonsei Electric Power Research Center (YEPRC)
12 04. 2007 - 03. 2010
(completed)
F/S : 21C Frontier R&D (Ministry of Science & Technology), Korea
“Fault current limiter control/design for grid-connection”
11 12. 2006 - 11. 2008
(completed)
F/S : Seoul R&D Program (서울시), Korea
Parameter Optimization of Power System Stabilizer (PSS) and Flexible AC Transmission System (FACTS) Based on Trajectory Sensitivities
10 11. 2007 - 12. 2008
(completed)
F/S : Korea Research Foundation (학술진흥재단), Korea
Study on Electric Load and Electricity Price Forecasting Method Using Recursive Neural Network with Sensitivity Analysis of Similar Days
09 03. 2007 - 02. 2008
(completed)
F/S : Ministry of Commerce, Industry and Energy (산업자원부), Korea
Real-time Power quality monitoring and load composition estimation for digital metering system
08 11. 2006 - 10. 2007
(completed)
F/S : Ministry of Commerce, Industry and Energy (산업자원부), Korea
Advanced Techniques for Wide-Area Blackout Prevention (collaborated with Korea University - shared credits 50%)
07 11. 2006 - 10. 2007
(completed)
F/S : Korea Research Foundation (학술진흥재단), Korea
Power System Optimization with Embedded Neural Networks Using Hybrid System Modeling
06 10. 2006 - 09. 2007
(completed)
F/S : Ministry of Commerce, Industry and Energy (산업자원부), Korea
Development of advanced safety system through analysis of electric power contingency.
05 09. 2005 - 08. 2006
(completed)
F/S : Yonsei University, Korea
New optimal controller design for synchronous generator using the approximate dynamic programming
04 08. 2003 - 08. 2004
(completed)
F/S : IEEE Power Engineering Society (PES), USA.
Global dynamic optimization of power network and system parameter optimization by hybrid system/control approach.
03 01. 2002 - 08. 2003
(completed)
F/S : National Science Foundation (NSF), USA.
New optimal control for FACTS (Flexible A.C. Transmission System) devices in electric power grid.
02 02. 2002 - 11. 2002
(completed)
F/S : Duke Power Company, USA.
New AVR-Excitation/Speed Governor-Turbine system design and testing for Allen-1 (Round rotor generator model).
01 08. 2000 - 12. 2001
(completed)
F/S : National Science Foundation (NSF), USA.
Real-time indirect adaptive/optimal control algorithms for synchronous generator in a power system.

 

03722 서울특별시 서대문구 연세로 50, 연세대학교 공과대학 전기전자공학부

행정실: C725 / TEL: 02-2123-4631
연구실 A: C727 / TEL: 02-2123-7839
연구실 B: 공학원 320A / TEL: 02-2123-8290
E-mail : jungpark@yonsei.ac.kr (교수님 연구실 : 02-2123-5867)

PROFESSOR JUNG-WOOK PARK

OFFICE: SCHOOL OF ELECTRICAL AND ELECTRONIC ENGINEERING

ADMINISTRATION OFFICE: C725 / TEL: +82-2-2123-4631
OFFICE A:C727 / TEL: +82-2-2123-7839
OFFICE B:ERC320A / TEL: +82-2-2123-8290
YONSEI UNIVERSITY, 50 YONSEI-RO, SEODAEMUN-GU, SEOUL, 03722, KOREA

COPYRIGHT(C) 2008. YONSEI POWER & CONTROL SYSTEM LABORATORY. ALL RIGHTS RESERVED.