NO | 과제기간 | 과제명 |
69 | 06. 2020 - 02. 2029 (in progress) |
F/S : National Research Foundation (한국연구재단), Korea, Leading Researcher Program (리더연구)-단독 72억/9년 "Power System Research Center for Great Energy Transition (PREFER)" |
68 | 06. 2023 - 02. 2030 (in progress) |
F/S : National Research Foundation (한국연구재단), Engineering Research Center (ERC), Korea University - 참여 "Resilient Autonomous Grid Research Center" |
67 | 12. 2024 - 12. 2025 (in progress) |
F/S : (주) LG Electronics, Korea "Development of RAC PFC of 2 kW" |
66 | 11. 2024 - 10. 2025 (in progress) |
F/S : (주) Hyosung Corp [Hyosung-Yonsei Cooperative Research Center] "Evaluation Process Development to Analyze the Offshore Wind Power Plants" |
65 | 12. 2023 - 12. 2024 (completed) |
F/S : Yonsei Frontier Lab., Yonsei University "[YDS] AI-Based Stability Evaluation of Power System on Energy Transition" |
64 | 08. 2023 - 05. 2024 (completed) |
F/S : (주) Hyosung Corp “Evaluation Process Development to Analyze the Effect of ESS Power Plants on Large-Scale Power system” |
63 | 03. 2023 - 02. 2024 (completed) |
F/S : (주) Hyundai NGV (Hyundai Mobis), Korea “Development of Overmodulation Method for Efficiency and Performance Optimization of Electric Vehicle Driving System” |
62 | 08. 2023 - 10. 2023 (completed) |
F/S : (주) KEPCO, Korea “New Establishment of Transmission and Distribution Network Operation System” |
61 | 05. 2022 - 04. 2023 (completed) |
F/S : (주) Hyosung Corp “Analysis of Effect of ESSs on Power Plant and Development of Its Detailed Model Based on Digslient Power Factory Software” |
60 | 06. 2022 - 02. 2023 (completed) |
F/S : [Technical Consulting] (주) KEPCO-KEPRI, Korea “Energy Transition - CFI (Control, Flexibility, and Inertia) Expert Working Group” |
59 | 05. 2022 - 04. 2023 (completed) |
F/S : (주) LG Electronics Inc., Korea “Development of Power Module Solution for 400 kW EV Fast Charger with High Efficiency and Small Size” |
58 | 10. 2018 - 01. 2022 (completed) |
F/S : (주) ESP, Korea “Protection of Modular Green S/.S and Development of Monitoring Operation System for System Devices” |
57 | 07. 2021 (completed) |
F/S : (주) KEPCO, Korea “[Consulting] Evaluation of Hosting Capacity of Renewables in Substation with 80 MVA Transformer” |
56 | 06. 2018 - 06. 2021 (completed) |
F/S : (주) KEPCO, Korea |
55 |
07. 2020 - 04. 2021 |
F/S : (주) KEPCO, Korea |
54 |
06. 2020 - 03. 2021 |
F/S : (주) Hyosung Corp. |
53 |
01. 2020 - 12. 2020 (completed) |
F/S : (주) Hyundai Heavy Industries Co. LTD., Korea “Development of Energy Management System of Electric Ship with Power Network Optimization and Load Forecasting Based on Navigation Data” |
52 | 05. 2017 - 04. 2020 (completed) |
F/S : KETEP (에너지기술평가원), Korea “Development of Integrated PV/ESS System and Its EMS to Solve Capacity-Congestion of Distribution System of South Korea” |
51 | 09. 2019 - 11. 2019 (completed) |
F/S : [Technical Consulting] KERI “Strategy to Improve Hosting Capacity of Variable Renewable Energy in Korea Power System on Energy Transition” |
50 | 09. 2011 - 11. 2019 (completed) |
F/S : National Research Foundation (한국연구재단), Korea - National Research Lab. (국가지정연구실) - 중견자 전력(도약)연구사업 - 1, 2단계(5년) + 후속(3년) “A Study on Renewable Energy Based Integrated Optimal Operation and Analysis to Improve Reliability of Power System” |
49 | 06. 2018 - 03. 2019 (completed) |
F/S : (주) KEPCO, Korea “Estimation of Renewable Energies Based DGs’ Capacity Permissible to a Practical Sub-station of South Korea” |
48 | 02. 2018 - 10. 2018 (completed) |
F/S : (주) KEPCO, Korea “Grid-Code Development for DG Connection to 69 kV New Transmission System” |
47 | 12. 2016 - 10. 2018 (completed) |
F/S : (주) Hanwha Techwin Inc., Korea “Development of Small-Size Inverter & Converter for Unmanned Search Vehicle” |
46 | 06. 2017 - 06. 2018 (completed) |
F/S : (주) DIK, Korea [Industry Consulting] “Planning and Operation of Microgrid and its EMS” |
45 | 05. 2017 - 03. 2018 (completed) |
F/S : (주) Mando, Korea “Improvement of Inverter Efficiency of 30% by New PWM Method Applied to IDB System” |
44 | 04. 2016 - 01. 2018 (completed) |
F/S : (주) KEPCO-KEPRI via KESRI, Korea “Grid-Code Development of Distributed Generations in Stand-Alone Microgrid of Islanded Area” |
43 | 01. 2014 - 12. 2017 (completed) |
F/S : (주) POWERNIX, Korea “Design of Voltage-Source-Converter(VSC) Based FACTS Devices” |
42 | 12. 2014 - 09. 2017 (completed) |
F/S :KETEP (에너지기술평가원), Korea “PMU Based Multi-Microgrid Integrated Connection and Optimal Operation” |
41 | 05. 2016 - 04. 2017 (completed) |
F/S : (주) LG Electronics Inc., Korea “Consulting of Energy Savings via Smart Factory” |
40 | 10. 2016 - 03. 2017 (completed) |
F/S : (주) KEPCO, Korea “Re-Establishment of Grid-Code for Distributed Generations Connected to Transformer-Bank” |
39 | 04. 2016 - 02. 2017 (completed) |
F/S : (주) KEPCO-KEPRI via KESRI, Korea “A Study on Benefit-Cost Analysis for Distributed Energy Resource Considering Environmental Cost” |
38 | 09. 2014 - 08. 2016 (completed) |
F/S : National Research Foundation (한국연구재단), Korea “Engineering Research Center (ERC) - WeGAT, ChonBuk National University” |
37 | 10. 2015 - 06. 2016 (completed) |
F/S :(주) Mando, Korea “Design of Automotive IDB Inverter with High Efficiency via Optimal PWM and Ripple Reduction” |
36 | 08. 2013 - 07. 2016 (completed) |
F/S : KETEP (에너지기술평가원), Korea “Development of 6 kW Grid-Connected Hybrid PV PCS with EMS" |
35 | 11. 2014 - 10. 2015 (completed) |
F/S : Electric Power Public Tasks Evaluation & Planning Center (전력산업기반조성센터), Korea “National Power Security and Wide-Area Blackout Prevention (Reliability Project)” |
34 | 07. 2014 - 06. 2015 (completed) |
F/S : (주) LG Electronics Inc., Korea “Development of 2kW PFC Converter Applied to Input Voltage in Wide Ranges” |
33 | 06. 2014 - 02. 2015 (completed) |
F/S : KOITA - (주) KD Power Inc, Korea “Development of PV String-Group MPPT and Circulation-Inverting Based PCS” |
32 | 03. 2014 - 12. 2014 (completed) |
F/S : (주) Hyundai Heavy Industries Co. LTD., Korea “Design of Wind Power Plant and Its Evaluation Software Development” |
31 | 07. 2014 - 12. 2014 (completed) |
F/S : (주) KEPCO via KESRI, Korea “A Study on Optimal Operating Reserve Required Capacity of Korea Power System” |
30 | 09. 2010 - 06. 2015 (completed) |
F/S : KETEP (에너지기술평가원), Korea “Next-Generation High-Performance Super-Grid Research Center” |
29 | 12. 2013 - 11. 2014 (completed) |
F/S : (주) Jeju Kim-Nyeong Wind Power Company, Korea “Analysis of Effect and Power Quality of Distribution System with Wind Power Plant” |
28 | 12. 2013 - 11. 2014 (completed) |
F/S : (주) KEPCO via KESRI, Korea (with HongIk University) “Planning of Transmission System of HVDC Applied to Korea Power System” |
27 | 12. 2013 - 09. 2014 (completed) |
F/S : KETEP (에너지기술평가원), Korea “Development of Induction Heating System for Reactor Coolant Pump in Nuclear Power Generation” |
26 | 01. 2014 - 06. 2014 (completed) |
F/S : (주) SHINC, Korea “Design of Grid-Connected Distributed Generation PCS Inverter” |
25 | 03. 2012 - 02. 2014 (completed) |
F/S : (주) Mando, Korea “Development of Power Control Logic for Electric Vehicle MSG and Energy Storage Optimization” |
24 | 10. 2013 - 12. 2013 (completed) |
F/S : (주) KEPCO via KESRI, Korea “Analysis of Transmission System and its Response Strategy and due to Expansion of Distributed Generations” |
23 | 05. 2013 - 12. 2013 (completed) |
F/S : (주) KEPCO via KESRI , Korea “Improvement of Grid-Connection Profile due to Expansion of Distributed Generations” |
22 | 03. 2012 - 11. 2013 (completed) |
F/S : (주) KEPCO, Korea “Development of Measurement-Based Dynamic Load Modeling” |
21 | 09. 2010 - 08. 2013 (completed) |
F/S : National Research Foundation (한국연구재단), Korea “Study on Optimization for Bi-Directional Protection Coordination Based on Digital Protective Relay Applied to Multi-DGs” |
20 | 03. 2008 - 02. 2013 (completed) |
F/S : BK21, Ministry of Education, Science and Technology (교육과학기술부), Korea “BK21 TMS Institute of Technology” in School of Electrical & Electronic Engineering, Yonsei Univ. |
19 | 12. 2010 - 11. 2012 (completed) |
F/S : (주) E-Korea, Korea “Smart Grid Based Electric Machine Condition Monitoring System Development” |
18 | 08. 2010 - 07. 2012 (completed) |
F/S : LS Industrial Systems (LS 산전), Korea “Development of 3 kW Grid-Connected PV Inverter & Battery Management System” |
17 | 05. 2009 - 04. 2012 (completed) |
F/S : Korea Research Foundation (학술진흥재단), Korea “New Power Quality Index in a Distribution Power System Based on Real-Time Optimization Model” |
16 | 04. 2011 - 01. 2012 (completed) |
F/S : Korea Power Exchange (전력거래소), Korea “Effect of Demand Response (DR) on Long-Term Load Forecasting” |
15 | 08. 2010 - 01. 2012 (completed) |
F/S : Korea Power Exchange (전력거래소), Korea “Load Modeling Applied to Korea Power System” |
14 | 11. 2010 - 04. 2011 (completed) |
F/S : POSCO (포스코), Korea “A Study on Distributed Generation Based Economic Dispatch, Power Quality, and Demand Response for Application to Energy Management System” |
13 | 07. 2007 - 06. 2011 (completed) |
F/S : Ministry of Commerce, Industry and Energy (산업자원부), Korea “New Electric Machines Applied to Power Grid” Yonsei Electric Power Research Center (YEPRC) |
12 | 04. 2007 - 03. 2010 (completed) |
F/S : 21C Frontier R&D (Ministry of Science & Technology), Korea “Fault current limiter control/design for grid-connection” |
11 | 12. 2006 - 11. 2008 (completed) |
F/S : Seoul R&D Program (서울시), Korea Parameter Optimization of Power System Stabilizer (PSS) and Flexible AC Transmission System (FACTS) Based on Trajectory Sensitivities |
10 | 11. 2007 - 12. 2008 (completed) |
F/S : Korea Research Foundation (학술진흥재단), Korea Study on Electric Load and Electricity Price Forecasting Method Using Recursive Neural Network with Sensitivity Analysis of Similar Days |
09 | 03. 2007 - 02. 2008 (completed) |
F/S : Ministry of Commerce, Industry and Energy (산업자원부), Korea Real-time Power quality monitoring and load composition estimation for digital metering system |
08 | 11. 2006 - 10. 2007 (completed) |
F/S : Ministry of Commerce, Industry and Energy (산업자원부), Korea Advanced Techniques for Wide-Area Blackout Prevention (collaborated with Korea University - shared credits 50%) |
07 | 11. 2006 - 10. 2007 (completed) |
F/S : Korea Research Foundation (학술진흥재단), Korea Power System Optimization with Embedded Neural Networks Using Hybrid System Modeling |
06 | 10. 2006 - 09. 2007 (completed) |
F/S : Ministry of Commerce, Industry and Energy (산업자원부), Korea Development of advanced safety system through analysis of electric power contingency. |
05 | 09. 2005 - 08. 2006 (completed) |
F/S : Yonsei University, Korea New optimal controller design for synchronous generator using the approximate dynamic programming |
04 | 08. 2003 - 08. 2004 (completed) |
F/S : IEEE Power Engineering Society (PES), USA. Global dynamic optimization of power network and system parameter optimization by hybrid system/control approach. |
03 | 01. 2002 - 08. 2003 (completed) |
F/S : National Science Foundation (NSF), USA. New optimal control for FACTS (Flexible A.C. Transmission System) devices in electric power grid. |
02 | 02. 2002 - 11. 2002 (completed) |
F/S : Duke Power Company, USA. New AVR-Excitation/Speed Governor-Turbine system design and testing for Allen-1 (Round rotor generator model). |
01 | 08. 2000 - 12. 2001 (completed) |
F/S : National Science Foundation (NSF), USA. Real-time indirect adaptive/optimal control algorithms for synchronous generator in a power system. |